Skip to content
AUAustralia

How to Take On Locksmith Strata Work

Set up authority, work orders, pricing, key custody, invoicing and job costing before taking on strata properties.

Yes Foreman · 1 October 2026 · Winning and keeping clients

A lot occupier meets you at the door, but the work order does not say whether they can approve replacement hardware. Locksmith strata work goes wrong when your tradie has to guess.

Treat the strata customer as an account. Set the standing account details once. Then control every dispatch with its own work order, property access authorisation, quote, variation, key record, completion note and invoice.

Choose locksmith strata work your operation can serve

Start with the work you can perform properly. Do not promise coverage across a strata portfolio before checking the properties, hardware and dispatch demands.

Separate the job types you will accept:

  • Emergency entry after an authority check
  • Diagnosis of a reported lock fault
  • Repair of locks, latches and related hardware
  • Replacement of identified hardware
  • Rekeying with an agreed key quantity
  • Key cutting and controlled handover
  • Temporary securing after damage
  • Access-control work that sits within your permitted scope

Entry, diagnosis, repair, replacement, rekeying and temporary securing are different jobs. Each needs its own booking questions, materials and approval path.

Set an accept-or-decline gate for each enquiry. Accept the job only when you can complete the right-to-enter check, reach an authorised approver, identify or inspect the hardware, and source the required parts. For controlled keys, require authority from the person or organisation that controls the system.

Check hardware competence before dispatch. If your tradies do not know the lock, access device or door hardware, arrange a qualified person or decline that scope. Do the same when parts cannot be sourced within the customer's required attendance window.

After-hours work needs a real dispatch route, an available approver and tradie coverage. Access-control work must sit within your permitted scope. Do not accept it because the rest of the door job looks familiar.

Check the portfolio against your service area. Record the suburbs and postcodes, building types, parking conditions, site access, requested service hours and hardware you are expected to handle. Decline properties that sit outside your operating limits.

Then check office capacity. Someone must receive the work order, contact the site, identify the approver, track key custody, send the completion record and match the invoice. Field time is only part of the job.

Write a short list of accepted job types and the postcodes you can cover without disrupting booked work.

Prepare the strata account file before asking for work

Build one standing account file for the strata customer. Do not use it as authority for a particular lot. Its job is to hold the commercial and dispatch details that apply across the relationship.

Record:

  • Legal business name and trading name
  • ABN and GST status
  • Payment details
  • Main dispatch contact
  • Accounts contact
  • Service area
  • Accepted job types
  • Booking and cancellation route
  • After-hours dispatch route
  • Quote and variation approvers
  • Required work order or purchase order reference
  • Licence information requested for the work
  • Current evidence for insurance policies actually held

Take ABN, GST and BAS questions to the Australian Taxation Office (opens in a new tab). Take company and business name registration questions to ASIC (opens in a new tab). Do not copy tax or registration answers from another supplier's paperwork.

For work in New South Wales, ask the NSW Police Force Security Licensing and Enforcement Directorate (opens in a new tab) which security licence covers the proposed locksmith work and write down the answer. Elsewhere, check with the state or territory security-licensing authority for the place where the work occurs.

Mention a separate trade regulator only when the proposed scope crosses into that trade. Ask that regulator whether the added work sits within your permitted scope before accepting it. A locksmith work order does not expand your licence.

Keep current evidence for policies your business actually holds. Check that the insured entity matches the business taking the order and that the described work matches the proposed scope. Ask the relevant state or territory authority about legal insurance requirements rather than relying on a strata customer's onboarding form.

Questions about worker cover go to your state or territory workers' compensation insurer or regulator. Workplace safety questions go to your state or territory WHS regulator. Keep those questions separate.

Make a reusable account file, then remove any document the strata customer has not requested.

Build the strata authority map before dispatch

Locksmith strata work has several handoffs. The owners corporation or body corporate, strata manager, building manager and lot contact can each have a different role. Preserve the customer's own name for each role.

Create these account fields:

Account fieldName and contactWhat to record
Legal entity named on the order[Name and details]Party issuing or accepting the order
Billing entity[Name and details]Party named for invoicing
Owners corporation or body corporate[Name and details]Role stated by the customer
Strata manager[Name and details]Dispatch, quote or billing role
Building manager[Name and details]Site coordination and common-area access
Lot contact[Name and details]Occupier contact and agreed entry method

Then record four separate decisions:

  1. Who can send the work order?
  2. Who can permit entry?
  3. Who can approve a variation?
  4. Who accepts the invoice and completion record?

One person may fill several roles. Record that rather than assuming it. The person who opens the door may have no authority to approve spending.

Record the legal entity named on the order and the billing entity exactly as supplied. Keep any dispute about lot or common-property responsibility as a separate unresolved question. Do not assume the owners corporation or body corporate is the contracting or paying party.

Do not let your tradie decide whether a failed lock belongs to a lot or common property. The work order must name the area, responsible billing entity and person who can approve the work. If those details are disputed, stop and send the question back to the account contact.

Add the contacts and decisions to every strata account before accepting a dispatch.

Ask for one controlled work order first

Do not ask for the whole portfolio at once. Ask for one defined job. Use it to test how the strata office dispatches, approves and pays for work.

A standing account record and a property-specific work order do different jobs. The account record holds the ongoing rules. The work order tells you what is authorised at one property. Read what a work order needs to control before building your form.

Require these fields on the first work order:

  • Legal entity issuing or accepting the order
  • Billing entity
  • Property address and postcode
  • Lot or common area
  • Work order or purchase order reference
  • Requester
  • Site contact
  • Person authorised to permit entry
  • Reported fault
  • Requested outcome
  • Occupancy status
  • Entry method
  • Authority type: diagnosis only, work up to an approved limit, or work against an accepted quote
  • Approved spending limit where one applies
  • Attendance window
  • After-hours status where relevant
  • Person authorised to approve a variation
  • Completion-record recipient
  • Invoice recipient

The work order says what has been requested and how far the authority extends. It does not prove that the reported diagnosis is right. “Rekey” may describe the manager's requested outcome while the actual fault sits in the latch, frame or door alignment.

Use the first job to test every handoff. Did the site contact answer? Did the authority details match? Could your tradie reach the variation approver? Did accounts accept the reference on the invoice? Fix one failed handoff before offering wider coverage.

Ask a prospective strata manager for one property-specific work order, not a loose instruction by phone.

Confirm property access authorisation before travel

Match the requester, billing entity, address, lot or common area, occupier and entry method to the work order. Do this before dispatch. Check the details again on arrival.

Keep access authority separate from spending authority. A building manager may open a plant room. A lot occupier may open their front door. Neither automatically has authority to approve a new lock, extra keys or frame repairs.

Stop when the caller, site contact, address or occupancy details do not match. Contact the account representative named on the work order. Record the mismatch and the instruction you receive.

For an entry job, use the detailed locksmith proof-of-ownership and right-to-enter checks. Urgency does not turn a standing strata account into blanket permission to enter every lot.

Keep door codes, key details and occupier information out of broad email chains and general chat messages. Put only the required details in the controlled property record.

Make the office confirm the lot, occupier and entry contact before giving the tradie a dispatch time.

Inspect before you quote the scope

Read the reported fault, then inspect the opening. Check the key, cylinder, lock, latch, door, frame, hinges, closer and connected hardware that could cause the problem.

Ask what the opening is doing. Is the door secure, damaged or misaligned? Does the key turn, stick, spin or fail to enter? Use focused photographs where they help, without collecting unrelated images from an occupied lot.

Choose the scope after that check:

  • Entry only
  • Diagnosis and written findings
  • Repair within a stated limit
  • Replacement of named hardware
  • Rekeying with an agreed key count
  • Temporary securing before a return visit

A work order that says “rekey” does not authorise every repair around the lock. If the latch or frame is causing the fault, tell the named approver what you found. Do not let the occupier choose replacement hardware unless the authority map gives them that power.

If you cannot inspect before attending, quote a defined diagnostic visit. After inspection, send the repair or replacement quote to the nominated approver.

Add lock, latch, door, frame, hinges and closer to the inspection record used by your tradies.

Price locksmith strata work by work order

Price the defined job. Not the relationship. A busy strata account can still lose money one work order at a time.

Build cost from:

  • Attendance and job travel
  • Diagnostic labour
  • Repair or installation labour
  • Hardware and fasteners
  • Keys and access devices
  • Equipment used for the job
  • Office handling tied to the work order
  • A share of overhead

Add markup to cost to produce the selling price. Use your own figures and the labour, materials, overhead and markup pricing method. Do not copy a blanket rate from another business.

Markup is what you add to cost. Margin is profit as a share of the selling price. They are not interchangeable.

Put the following in the quote:

  • Property and work order reference
  • Reported fault
  • Inspection information used
  • Exact work included
  • Hardware specification
  • Key or access-device quantity
  • Labour and attendance assumptions
  • Testing and handover
  • Exclusions
  • Quote validity on your own terms
  • Person authorised to approve a variation
  • Invoice reference required by accounts

Keep repair and replacement as separate scopes when inspection has not settled the fault. State whether making the opening temporarily secure is included or needs approval.

Write a variation when site conditions change

The work order says rekey. Inspection finds that the latch, frame or door alignment is causing the fault. That is a changed scope, not a quick favour.

Stop. Record the condition. Photograph what matters. Describe the added or substituted work and state the added price. Send it to the person named as the variation approver and get written approval before continuing.

The variation must connect:

  • The original work order and quote
  • The condition found
  • The original scope affected
  • The added or substituted work
  • The price change
  • The approving person
  • The approval record

A phone call can explain the fault. Follow it with a written record. Do not ask the lot occupier to relay approval to the strata office.

Worked example: keep the approved change separate

Oak Street is the house electrical example from another trade. All figures are sample currency units, not locksmith prices or an AUD rate card.

R. Chen's quote Q-1847 at 14 Oak Street was 1,105 for a 150mm bathroom exhaust fan ducted through the roof and four LED downlights. The ceiling was lined, and the quote excluded chasing. Extra cable and chasing were approved on site as a 160 variation. Invoice INV-1847 was therefore 1,265.

Keep the 160 variation attached to the original quote and approval. Do not silently rewrite the quoted scope after the job.

Control locksmith key records from collection to return

A master key or access device is not just another material line. Record its custody against the property and work order.

Your locksmith key records should show:

  • Property and work order reference
  • Key or device identifier used by the customer
  • Quantity collected
  • Person releasing it
  • Tradie receiving it
  • Each transfer during the job
  • Quantity cut, issued or returned
  • Named handover recipient
  • Any missing item or unresolved discrepancy

Do not place sensitive bitting, access codes or unnecessary identifiers in an invoice description or general message. Use the customer's controlled identifier where one exists.

Count keys and devices at every handover. Record the recipient rather than writing “left on site”. If the planned recipient is absent, contact the account representative and get a new handover instruction.

When a discrepancy appears, stop the handover and record it. Do not alter the count to make the form balance.

Send a closeout record the strata office can use

The repaired lock is not the whole handover. The strata office needs a record it can match to the work order and use when the next fault is reported.

Include:

  • Property and work order reference
  • Area or lot attended
  • Work completed
  • Relevant hardware identifiers
  • Key and access-device quantities
  • Functional test performed
  • Focused completion photographs
  • Temporary securing measures
  • Unfinished work and reason
  • Return visit required
  • Name of the person receiving keys or access devices

State what you tested. Do not write “all good” when you can record that the key operated, the latch engaged and the door secured at handover.

If another defect remains outside scope, name it without implying you repaired it. Send it to the authorised contact for a separate decision.

Send the completion record to the nominated recipient before the invoice reaches accounts.

Match the invoice and job cost to one work order

Accounts may reject a correct repair when the invoice lacks the strata work order or purchase order reference. Copy the reference exactly. Match the invoice lines to the approved quote, variations and completion record.

Show enough detail for accounts to reconcile the charge:

  • Billing entity and property
  • Work order or purchase order reference
  • Approved scope
  • Hardware and key quantities where required
  • Approved variation reference
  • Completion date
  • Payment details agreed for the account

Ask the Australian Taxation Office (opens in a new tab) about GST and tax invoice questions. Do not guess at the current document rules.

Then close the cost record for that individual work order. Compare actual vs estimated cost for labour, materials, travel, equipment and office handling. Do not spread one property's missed labour across the whole strata account and call the portfolio profitable.

The Oak Street example shows the calculation without creating a locksmith target. Against original quote Q-1847 of 1,105, job cost was 850 and profit was 255. Margin was 255 ÷ 1,105, about 23%. Markup was 255 ÷ 850, or 30%.

Do not calculate profit from invoice INV-1847 of 1,265. The costs of the 160 variation were not supplied. Combining the invoice with the original job cost would give a false result.

For a fuller closeout process, use the Australian job-costing guide for actual versus estimated cost. If the account includes recurring service billing, keep every planned visit tied to a defined scope and work order rather than sending an unexplained standing charge.

Close labour and material costs against the work order before reviewing the account as a whole.

Ask for the next controlled work order

Review the first job with the strata manager. Keep the conversation on handoffs, not compliments.

Ask:

  • Did the work order reach the right contact?
  • Did the property access authorisation match the person on site?
  • Did the variation reach the right approver?
  • Did the key handover record meet the account's needs?
  • Did accounts accept the invoice reference and supporting record?

Fix the failed step. Then give the manager a short dispatch sheet showing your accepted job types, service area, booking contact and records required for the next job.

Job management software for tradies can keep the work order, quote, variation, key handover, completion record and invoice under the same job. Yes Foreman can hold that trail for locksmith jobs so the office and field record stay together.

If the first locksmith strata work order closed without loose approvals or missing records, ask for one more named property and a complete work order. Earn wider portfolio coverage by controlling that job too.

Put the next job in one place

Yes Foreman connects quotes, schedules, crews, timesheets and invoices for small field-service teams.