Skip to content

The back office for trades, run by AI

Foreman quotes, schedules your crews, invoices finished work and chases what's owed. It asks before anything reaches a client, and learns what it can just get on with.

Foreman · Greenline Landscaping (sample)Open the live demo
Foreman's Today page in a sample landscaping business
Works with
  • xero
  • QuickBooks
  • stripe
  • Gmail
  • Google Calendar
iPhone + Android crew app
Someone asleep at a desk late at night under a lamp, paperwork in front of them

The problem.

You're great at the work, the paperwork runs you

The after-hours office
Quotes typed up at the kitchen table, invoices sent on Sunday, Friday spent chasing who still owes you.
The group-chat roster
Jobs on a whiteboard, changes in a chat nobody reads, and two utes in the same suburb an hour apart.

Stop doing it at 9pm.

Quote, schedule and get paid, without the late nights

One app for the office and the crew, with AI doing the busywork.

Quotes in minutes

An enquiry, a few photos or a voice note in; an itemised quote out, priced from your own list. Totals and tax are worked out by code, not guessed.

AgentQuoting

Crews routed for you

Accepted work goes to a crew. Optimise day shares the visits so each crew works one area, and the times update themselves.

FeatureSchedule

Paid without chasing

Finished visits become invoices, and overdue ones get a polite reminder with the pay link. Each one asks first until you trust it.

AgentInvoices
  1. Start with what you already have

    Bring in your clients, price list and crew. Connect Xero or QuickBooks and your calendar. Foreman learns your prices and the way you write.

    Quotes list with amounts awaiting a response and accepted
  2. Let Foreman do the busywork

    Replies, quotes, invoices for finished visits and reminders for overdue ones are drafted for you, and wait on Today for a yes.

    Today, with Foreman's drafts waiting for approval
  3. Stay in control of every crew

    See every crew on one map, with the drive between stops. Hand Foreman the jobs it has earned; one undo puts any of them back to asking.

    The schedule map with each crew's route for the day

Built for the field, not the desk.

Make your crew happy with an app they'll open

Their day, on their phone

Runs in order, directions, job cards, photos and sign-off. Works without signal and catches up later.

Every crew on one map

Live vans, ticks as visits finish, and the drive between stops. Drag a visit to another crew in a second.

Ask it anything

Who hasn't paid this month? What's on tomorrow? Answers come from your own records, with the records it used.

Try it yourself.

Three crews, one suburb each

When two utes cross paths all day, that's fuel and an hour of labour gone. Press Optimise day: it runs the app's real optimiser, right here in your browser.

  • Mia's crew · 4
  • Grace's crew · 4
  • Tom's crew · 4
Driving today44 kmCrews criss-crossing

You check the new plan before anything moves.

ORG WATCH · BUILT INTO FOREMAN

Know what needs attention before it holds up the day.

Org Watch keeps checking your jobs, visits, quotes, invoices and enquiries in the background. When something needs a person, it lands in one list — Needs attention — with the facts and a suggested next step, so your team can sort it and move on.

INTERACTIVE EXAMPLETomorrow’s visit. One missing crew.
FROM A LOOSE END TO A CLEAR NEXT STEP
  1. Your businessJobs · visits · invoices
  2. Org WatchConnects the dots
  3. Needs attentionA visit needs a crew

Choose a step or play the walkthrough

Checks run in the background. A visit tomorrow has nobody assigned, so it appears in Needs attention under Act now.

ILLUSTRATION · SAMPLE DATABased on the Needs attention screen
Needs attentionCheck now

Act now · 1

“Hedge trim & green waste” starts in 18h with nobody assignedAct nowJob UnassignedPriya Harris · 12m ago
Resolve
  • An upcoming visit has no crewTick the crew and confirm, or open the schedule.
  • Finished work hasn't been invoicedCreate a draft invoice from the item, then review and send it yourself.
  • A new enquiry hasn't been followed upMove it to the next stage, or open the enquiry and get in touch.

Try it on your own jobs. Org Watch is part of every Foreman workspace.

ANOTHER JOB CALLING?

Hands full.
Calls covered.

Let the AI receptionist pick up, capture the enquiry and help arrange the next step while your hands are full.

Give it a go. Play the customer.

Live demo · No account needed · No real bookings
Incoming

Yes Foreman AI Receptionist

Ace Property Services

YOUR BUSINESS, CLOSE TO HOME

Feels local. Works together.

Choose your business country to see the right currency and setup details.

MADE TO FIT / AUD

GST & ABN details

Australian dollars, business details and GST settings for your quotes and invoices.

Xero payroll integration is available for Australian workspaces.

Xero · QuickBooks · Google Calendar · Gmail

ROOM FOR THE WHOLE CREW

More hands. Same price.

Pay for new job approvals, not your headcount.
Core tools, Org Watch and AI. Unlimited members.

Prices in AUD

Starter

60 approvals / month (50 + 10 free buffer)

$59/ month

Per workspace · billed monthly

10 GB storage · daily AI allowances apply

  • Unlimited office and field members
  • Core tools, AI assistance + Org Watch
  • Web and mobile apps
Try Foreman free

Growth

300 approvals / month (250 + 50 free buffer)

$249/ month

Per workspace · billed monthly

25 GB storage · daily AI allowances apply

  • Unlimited office and field members
  • Core tools, AI assistance + Org Watch
  • Web and mobile apps
Try Foreman free

Business

1,200 approvals / month (1000 + 200 free buffer)

$499/ month

Per workspace · billed monthly

100 GB storage · daily AI allowances apply

  • Unlimited office and field members
  • Core tools, AI assistance + Org Watch
  • Web and mobile apps
Try Foreman free

14 days free · No card required · 50 approved jobs during trial. Prices per workspace, excluding applicable taxes. Extra visits on the same approved job do not count again.

Compare all allowances and plans

Any questions?

Stop doing paperwork at night. Start with Foreman.

Something else? Talk to us